Case Study: Adelaide Convention Centre, Stage 2

MATERIALS: KingFlor® KF70®
BUILDER: Lend Lease
INSTALLER: Mitcon Formwork
PROJECT SPECIFICS:

  • Total of 6,000m2 of KingFlor® KF70®
  • 1.00mm steel formwork
  • 5.5m sheet lengths
  • Steel grade: G550


The Project

The $350 million redevelopment of the Adelaide Convention Centre in South Australia is set to boost the state’s economy by more than $1.92 billion over 25 years, elevating Adelaide as a true competitor on the global conferencing and exhibition stage.

With Stage 1 completed in 2014, Stage 2 of the centre’s redevelopment replaces the original Plenary Building constructed in 1987. Completed in 2017, the facility boasts a capacity increase of 3,500 seats with state-of-the-art, world-class convention and exhibition space.

Fielders were contracted by Lend Lease and Mitcon to supply over 6,000m2 of KingFlor® KF70® steel flooring throughout the development.

 

The Solution

KingFlor® KF70® was chosen for this project due to its longer spanning capability as compared to other steel decks on the market. KF70®’s unique design with wider coverage will not only save on preparatory costs, but also mean that the laying of the floor will overall be executed faster.

 

The Process

The supply of KF70® at the Adelaide Convention Centre commenced in September 2015 with a supply completion date of early-2016. The entire development saw completion and was open for business in mid-2017.

 

KingFlor® KF70®

Fielders KingFlor® is a revolutionary steel formwork solution ideal for complete concrete slabs in concrete and steel framed construction over lengthy spans. With a longer span and deeper profile than existing formwork systems on the market, KF70® is one of the most cost-effective solutions.

Project uses include commercial buildings, shopping centres, multi-storey buildings, multilevel carparks, and residential construction.

 

Click here to download the full Case Study.